Asked to bid a large job in the morning. After looking at the building on their website, I am not sure what would be the best way to tackle it. Traditional with lift rental or WFP. There are screens, as you can see. Any suggestions would be great. Also, I have estimated a price based on what I see in these pics, although I'm not sure what the other sides of the building look like. But, assuming that they are basically the same design, what would you bid?

If I can't handle this size job yet, (need to purchase WFP and system) should I try to sub it out?